Private preview. Groundwork is invite-only while we finish building — join the waitlist for an invite.
Product DesignFoundational

MVP Scope Matrix

Turn your MVP Scope work into a shareable visual — a prioritized matrix plotting each feature by value vs. effort, so the right cuts to make before you start building are obvious.

Created by the Groundwork teamGCreated by the Groundwork team

What you walk away with

A real wireframe set, built from everything you worked through — then critiqued the way a tough reviewer would and polished round by round. Plus a project summary that shows your work.

12 steps in the full journey.

Who this is for

Founders with a feature list longer than the first release can hold, who need the cuts to be obvious rather than argued.

What you'll actually decide

Where each feature sits on value against effort, and which quadrant makes the first release.

What first-time founders get wrong here

Estimating effort in a vacuum. Effort estimates made before anyone has looked at the actual integration or the actual data model are the reason the matrix reorders itself two weeks into the build.

The first 10 questions

This is where the conversation starts. Each answer shapes what gets asked next.

  1. 01What is the product, and roughly how many features or stories are you considering for the MVP?
  2. 02Have you already worked through an MVP Scope document, or is this your first pass?
  3. 03List every feature, story, or capability you're considering — don't filter yet, just get them all out.
  4. 04For each feature, how does it rank on user value — would users feel its absence immediately, eventually, or barely?
  5. 05For each feature, how does it rank on implementation effort — fast and easy, moderate, or expensive and complex?
  6. 06Which features directly test your core hypothesis — these must survive any cut?
  7. 07Which features are table stakes (users assume they exist) vs. differentiators (the reason users choose you)?
  8. 08What are the top 3 features that would move from out-of-scope to in-scope if you had 2 extra weeks?
  9. 09Looking at the matrix, are you actually building an MVP — or have you scope-crept into a v1 product?
  10. 10Generate chat summary

Related product design project types

Ready to work through it?

The first five questions of any project are free — no card required.

Join the waitlist →